From:                              route@monster.com

Sent:                               Friday, April 08, 2016 12:07 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 PMP

 

This resume has been forwarded to you at the request of Monster User xapeix03

Shahin Shafiq 

Last updated:  09/27/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Davie, FL  33328
US

Mobile: 561-254-4403   
Home:
954-434-5202
shahin717@hotmail.com
http://www.adaengineering.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Shahin Shafiq - Transportation Engineer

Resume Value: rkhrtc9bdzw4wfqy   

  

 

Shahin M. Shafiq, P.E., PTOE, PMP

Roadway Engineer/ Transportation Engineer

7721 NW 16 CT

Fort Lauderdale, FL 33024

Cell: (561) 254-4403, Home: (954) 905-9557

shahin.tamu@gmail.com 

 

OBJECTIVE: A challenging position in the field of Roadway Engineering/ Transportation engineering.

 

SPECIAL QUALIFICATIONS:

 

Over 10 years of responsible and diversified experience in:

·         Designing and managing transportation projects including design all phases, overseeing plan production and quality control, evaluate design alternatives in regards to operational and safety characteristics, social, economic and environmental impacts, right-of-way, and other pertinent costs factors. Perform constructability, biddability and field reviews.

 

·         Experienced in FDOT contractual procedures, FDOT phase submittal processes; FDOT risk management and value engineering process;  FDOT business planning process; Skilled in project engineering and scheduling; Skilled in FDOT electronic delivery of transportation plans; Skilled in computer aided drafting and design; Skilled in developing long range estimate (LRE) and TRANS*PORT systems.

 

·         Experienced in all phases of highway design projects from conceptual design to final design phases, PS&E and permitting in limited access highways and freeways, rural and urban resurfacing & reconstruction, pavement only, LAP, safety & design build projects.

 

·         Roadway horizontal and vertical geometric design, cross sections, profiles, typical section package, pavement design package, design exception-variation package, specification package, bid package construction phasing, signing & pavement marking, signalization.

 

·         Access management plan, MOT, lane closure analysis etc, value engineering.

 

·         Hands-on experience with highway drainage design, stormwater management which includes hydrology & hydraulics design, Flood plain analysis and modeling, scour analysis, culvert modeling, bridge hydraulics report preparation, pond siting and pond sizing, spread analysis, plan preparations, report writing, PD&E study and environmental resource permitting.

 

·         Hands-on experience with traffic engineering including site impact analysis, traffic modeling, travel demand analysis, Level of Service determination, Interchange justification report, clear zone report, delay study and parking study.

 

·         Hands-on experience with signal design including signal phasing, mast arm analysis.

·         Hands-on experience with land development, infrastructure and utilities design projects.

·         Hands-on experience with Construction management, project scheduling.

·         Hands-on experience with highway design software: GEOPAK, GEOPAK Drainage.

·         Proficient with Microstation Version V8i and AutoCAD 2011 CADD environment for producing contract drawings..

·         Working knowledge with CORSIM, VISSIM, TRANSYT 7, TransCAD, Synchro, HCS, CUBE, ICPR, HEC-HMS, HEC-RAS, PONDS, ASAD, MS-Project and Primavera P6.

EDUCATION

M. Eng. (Transportation)            Lamar University, Beaumont, Texas, USA, 2003

M. Sc. (Computer Science)       Texas A & M-Commerce ,Texas, USA, 2002

B. Sc. (Civil Eng.)                       BUET, Bangladesh, 1998

 

REGISTRATIONS:

Professional Engineer, State of Florida: 65195.

                                     State of Texas:  96434.

Professional Traffic Operations Engineer (PTOE): 3238

CERTIFICATION:

·         PMI-PMP: 1489731

·         MOT Advanced.

·         FDOT CTQP Asphalt Level 1 & 2.

SPECIAL TRAININGS:

Geopak advanced by Bentley

Geopak Drainage presented by Bentley

Pavement Design by FDOT

Intersection design presented by FDOT

Roadside barriers design by FDOT

Access management by FDOT,

ICPR hands-on training in Orlando

Primavera P-6

 

HANDS-ON KNOWLEDGE OF:

GeoPak,  GeoPak Drainage, Microstation

AUTOCAD, CIVIL 3D

ASAD, ICPR, PONDS, HEC-RAS, HEC-HMS

Primavera P6, Microsoft Project

CORSIM, CUBE, TRANSYT 7

Microsoft Word, Excel, PowerPoint, and Outlook

surface water permitting

US Army Corps of Engineers permitting

FDOT driveway and drainage connection permitting

FDEP water/sewer permitting

 

Work History

2010 to present: Lead Engineer, A.D.A. Engineering, Inc., Miami, FL

2009-2010: Transportation Engineer, Florida Dep of Transportation, District 6, Miami, FL

2008-2009: Transportation Engineer, American Consulting Eng. of Fl, LLC, West Palm Beach, FL

2005-2008: Engineer 4, Kimley-Horn & Associates, West Palm Beach, FL

2003-2005: Civil Engineer, Keith and Ballbe, Inc., Fort Lauderdale, FL

 

PROJECT EXPERIENCE

 

Highway Design / Transportation Engineering.

 

Miami-Dade Expressway (MDX) : Airport Expressway/ SR 112, From NW 21 Street to NW 27 Avenue, Miami, Florida, 2012 

2.5 Miles Major Freeway Restoration, Rehabilitation and Resurfacing (RRR), upgrading roadway geometry and toll plaza/ Gantry installation. I served as the lead design engineer for this project, scope of the project included milling and resurfacing an existing two-way three-lane divided urban freeway. I modified the non-compliant roadway components including acceleration and deceleration lanes, provided Open Road Toll (ORT) facility at west of NW 27 Avenue with gantry features. I prepared typical section package, exception/ variation package. I prepared an extensive RRR report documenting the all roadway, drainage, signing and pavement markings components, prepared a detail log sheets with deficient items, improved the existing drainage systems by realigning the existing drainage swale. I performed asphalt pavement design, prepared MOT layout, construction plans and computation books, exception/ variation package and specification package. I prepared a RRR report documenting all deficient components of this corridor for future improvements.

 

FDOT District 4: Exception Variations, Broward And Palm Beach County Projects, 2013.

As the lead engineer, I prepared exception package for longitudinal grade for Hollywood Blvd from NW 44 Ave to Park Road, University Drive from Royal Palm to Sample Road, sample Road from east of SR 7 to west of Rock Island Road, horizontal alignment for Ocean Blvd/US 1from Boynton Beach Blvd to North Lakes and cross slopes for University drive from Royal Palm Blvd to Sample Road. Grades, horizontal alignment and cross slopes were deficient per AASHTO criteria.

 

Oaks Road Gateway Enhancement-LAP project, Town of Davie/ FDOT D4, FL:

Federal Funded Project, 2010

I worked as the project manager to assist Town of Davie in planning, designing, permitting, preparing bid documents and specifications package. I prepared the supporting document package for Broward County MPO Transportation Improvement Program (TIP) for planning requirements, determined the Environmental Class of Action and prepared documentation including National Environmental Act (NEPA) and Endangered Species Act (ESA).I processed all necessary forms including but not limited to LAP construction contract checklist, ROW certification, Programmatic Categorical Exclusion Checklist, LAP Utility coordination memo etc. I prepared the construction Plans, Specification package, and Estimates and Construction Bid Documents, Community Awareness Plan (CAP) and mini drip report. I performed the quality control to make sure that the project complies with federal, state and local design standards to fulfill the LAP agreement criteria. I coordinated and communicated with different federal, state and local agencies for their comments, concerns and recommendations. I assisted the client in selecting bid, reviewed shop drawings and provided construction management services.

 

FDOT District 6: NW 27th Ave (SR-9), NW11 St- NW 43rd St, Miami, Florida 

2.5 Miles Major Arterial State Road Restoration, Rehabilitation and Resurfacing (RRR) Roadway Project, 2009

I served as the lead Engineer for this project, scope of the project included milling and resurfacing an existing two-way three-lane divided urban highway. I modified the ADA ramps, improved the existing drainage condition, prepared typical section package, exception/ variation package, reconstructed an intersection, modified existing rail road crossing with current standards, executed license agreements with the adjacent property owners, performed asphalt pavement design, modified access management issues. I provided solution to the bottlenecking on Dolphin Expressway at NW 27 Avenue during the pick hours by modifying off ramp geometry, channelization on NW 27 Ave and changing the intersection plateau. I performed the partial reconstruction of NW 20 St & NW 27 Ave intersection plateau due to the pavement and base failure. I Perform constructability, biddability and field reviews.

 

 FDOT District 6: NE 6 Ave from NE 145th Street to Miami Gardens Drive (SR-860), 2.5 MILES, Miami, FL, 2.5 Miles Minor Arterial State Road Restoration, Rehabilitation and Resurfacing (RRR) Roadway Project, 2009

I served as the lead engineer for this project, which included milling and resurfacing an existing two-way three-lane divided urban highway. I modified the ADA ramps, improved the existing drainage condition. I performed pavement design, prepared typical section package, exception-variation package and implemented access management issues.

 

FDOT District 4:  I-595 Corridor Improvements Proposal Efforts From I-75/ Sawgrass Expressway to East of Hiatus Road, Broward County, Florida, 2008.

11.0 Miles Freeway Corridor Reconstruction and Widening (for Express Reversible Toll Lanes) Roadway Project

As a Project Engineer, my responsibilities included improvement of roadway geometry by adding the express lanes, modifying on and off ramps, design drainage systems for 4 miles long corridor from Sawgrass Expressway and I-595 interchange to East of Nobhill Road, analyzed the basin hydrology and hydraulics.

 

City of Port St. Lucie: Floresta Drive Widening, Southbend Blvd to Thornhill Blvd, St. Lucie County, Florida, 2008 

3.0 Miles County Road Reconstruction and Widening Project with intersection improvements

I served as the Project Engineer for this project, which included upgrading an existing two-way two-lane roadway to a two-way four-lane roadway with grass median including two roundabouts and side streets. The reconstruction of this local street within a residential neighborhood was with numerous driveway connections from a flush shoulder section to a curb and gutter section. I designed horizontal & vertical geometry of this roadway, prepared construction plans, performed the preliminary and final drainage design, Proposed cross-section, drainage structures, quantities are prepared with GeoPak. Performed drainage analysis using HEC-RAS & HEC-HMS.  

 

Turnpike Widening from Sunrise Blvd to Atlantic Blvd, Broward County, FL

8.0 Miles Toll Road Reconstruction and Widening Project with Toll Plaza Improvements, 2006

As a project engineer, I was responsible for upgrading an existing two-way 6-lane roadway to a two-way 8-lane roadway with median barrier walls including ramps & bridges at interchange and cross roads. I performed hydrology & hydraulics analysis, flood plain encroachment, conveyance systems design, roadway alignment, profiles, and cross sections. I prepared computation book and project cost estimation.

 

Turnpike Widening from Lake Worth Road to Indian Town Road, Palm Beach County, FL-   23 miles long roadway project development & environmental (PD&E) project, 2005.

I collected data for the whole project for roadway, traffic and drainage information, developed proposed typical sections and roadway alignment, searched & reviewed all permits around the projects, estimated required additional water quality treatment volume due to widening of the roadway from 4-lane to 8-lane, checked the treatment volume capacity of the existing road side swales, estimated additional required swale volume for the treatment, estimated existing cross culvert capacity and culvert extension length due to widening and additional culvert head losses, performed a pre-post analysis by ICPR for the different segments of the project, estimated flood encroachment storage, suggested different design alternatives with R/W requisition for offsite ponds. Independently worked on the whole project and completed the storm water management report.

 

County Road-48, Sumter County, FL, 2007 

1.0 Mile County Road Reconstruction and Widening Project     

I was a project engineer for the reconstruction of a local street within a residential neighborhood from a 2-lane flush section to a curb and gutter section. I developed cross sections and designed the drainage systems. Resolved drainage conflicts within a very intensive utility corridor, which included large water and sewer mains for two municipalities.

 FDOT District 7: SR301, Hillsborough County, FL 

1.0 ± Mile State Road Widening Project, 2007

Project consisted of 1 mile long roadway improvement from Fulkenberg to Causeway Boulevard in Hillsborough County. As a project engineer, my responsibilities included  permit search to find the existing flows directed to our project. Analyzed the existing hydrology using EPA-SWMM model. Designed two inter connected dry pond with control structures outfalling to Delaney Creek. Modeled the proposed improvement using EPA-SWMM. Performed drainage system design using GeoPak drainage. Went through the ERP permitting process under SWFWMD.

 

 

 

 

Old Boynton Road (From Congress Ave to Boynton Beach Blvd.), City of

Boynton Beach, FL- 0.80 ± Mile City Roadway Widening Project, 2005

As a project engineer for reconstruction of an about little over a mile city street within a residential neighborhood with numerous driveway connections from a flush shoulder section to a curb and gutter section in the City of Boynton Beach in Palm Beach County for the private developer (The Sembler Company). This project also includes replacing the existing wooden bridge. I Developed typical section and designed horizontal and vertical geometries, developed cross sections and signing & pavement marking plan using GeoPak and Microstation, calculated roadway and signing and marking quantities and prepared computation book by GeoPak  quantity manager. Provided drainage design and utility coordination. Attended design review meeting with county and responded to their comments. Supervised junior Engineers and CAD technicians to get the work done and did the work plan and helped PM for Scheduling.

 

SR 7 at Riverland (SW 20 Street), Fort Lauderdale, Florida, FDOT D4, Intersection Safety Improvements: 2010

I was the lead engineer for this project. The project runs in the south-north direction. I improved the safety features at this corridor including modifications to the existing “protected/permissive” left turn phase in the northbound and southbound directions to convert to a “protected only” phase at the intersection, extension of the northbound left turn lane to accommodate the peak hour vehicle demand, installation of a ground mounted guide sign on the south of SW 21st Street, installation of a ‘motorist warning system’ consisting of a “Signal Ahead Warning” sign W3-3 with flushing beacons facing the westbound traffic approaching the intersection, installation of bike lane and, providing pedestrian features at the intersection (including crosswalks, curbed cut ramps, pedestrian signal heads, pedestrian countdown signals), installation of concrete sidewalk and installation of guide stripes to properly guide westbound motorists across intersection. I performed Mast-Arm structural analysis using FDOT MathCad template V4.3 to consider one additional 3-signal head on each major direction. I prepared typical section package, pavement design package, Community Awareness Plan (CAP) and drainage mini drip report,

 

SR / US 441 at Southgate Boulevard, Fort Lauderdale, Florida, FDOT D4, Intersection Safety Improvements: 2011

I was the lead engineer. This section of SR 7/ US 441 is a 6-lane divided, classified as an urban principal arterial, runs north and south, access class 3 and 5, with a design speed and posted speed of 45 mph. This project addressed to all safety recommendations from the safety study. The improvements included variable message LED signs facing right turn traffic in all four directions. The signs would display “Yield TO pedestrians” when the motorists have green signal and would display “No Turn on Red” upon activation of pedestrian push button on the cross street, a ‘queue detection and motorist warning system’ (which consisted of vehicle detectors, ‘Prepare to Stop When Flushing’ signs with flushing beacons, pedestrian countdown signals facing the pedestrians crossing at all four approaches. The existing pedestrian clearance intervals at the intersection were increased based on a pedestrian speed of 3.5 ft/sec. The project also included milling and resurfacing of existing roadway, ADA compliant ramps at the intersection, high emphasis cross walks on all four approaches, installing a new mast arm. ). I prepared typical section package,

 

Traffic Engineering

 

Boynton Town Center , Palm Beach, FL: 2007

I Analyzed Traffic Impact (DEIS and FEIS) of the expansion of Boynton Town Center in Palm Beach County, Analyzed Traffic Impacts of Proposed commercial development, FL, Analyzed Traffic Impacts. I prepared signing and pavement marking plans, maintenance of Traffic (MOT) plans with different construction phasing and performed lane closure analysis to simulate the impact of closing lanes during the construction. I modified all the curb ramps per current ADA and FDOT design standards. I performed MUTCD traffic warrant analysis and prepared TMS (Traffic Monitoring Site) component plans.

 

Gateway to Sarasota ATMR 2006, Sarasota, FL

Worked as a traffic engineer/planner for the Annual Traffic Monitoring Report 2006 for a mixed-use development named Gateway to Sarasota. Analyzed new trips and traffic and proposed improvements. Completed safety analysis and delay study. Have used Synchro, Petra and Excel.

 

Naples Rinker Site Traffic Impact Study, Collier County, FL

Worked as a traffic engineer on traffic impact study for concrete batch plant on the existing roadway. Have used Synchro, Petra and Excel.

 

SR 776 Traffic Study, Charlotte County, FL

Worked as a traffic engineer on traffic impact study of a Big-Box impact study of a Bix-Box retail center on State Road 776 in Charlotte County. Responsible for trip generation, trip distribution, capacity analysis, warrant analysis, turn lane warrant analysis etc. Have used HCS+, Trans CAD.

 

I-75 Interchange Feasibility Study, Collier County, FL

Worked as a traffic engineer/planner for design of the interchange feasibility report for the proposed I-75 & Everglades Boulevard interchange project in Collier County. Prepared interchange justification report.

 

Congress Ave RRR project from Gateway Blvd to Wool Bright Rd, Palm Beach County, FL

Worked as a traffic engineer for typical section package, RRR report, lane closure analysis, clear zone report, pavement design report, ADA improvements

 

Drainage Design and Environmental Permitting

 

FDOT D6 & D4  : Palmetto Expressway (SR 826) and I-75 Express Lane Design Build From North of Dolphin expressway to I –75 NB ramp and I-75 From SR 826 to Miami Gardens Drive, Miami and Broward County,  Florida, 2013 

10 Miles Major Freeway reconstruction and realignment for new express lanes/ manage lanes. I served as the design engineer for this project. I analyzed the existing drainages systems, designed the proposed drainage system, adjusted and modified existing conveyance systems, analyzed cross drains and culverts.

 

District-wide Drainage Design & Plans Review Consultant Services. Florida Department of Transportation – District 6 (FDOT District 6). 2010-2011 

I am a Project Engineer for the District-wide Drainage Design & Plans Review Consultant Services for FDOT District 6.  Within this miscellaneous type contract, I am serving as a team member of general consultant for District 6 performing a variety of engineering assignments. The assignments associated with this project involve all aspects of Drainage Analysis and Design Services, Retrofitting Existing Drainage Systems, Permit Compliance, Hydrologic/Hydraulic Modeling, Bridge Hydraulics, Scour Analyses, Retention/Detention Pond, French Drain, Drainage Well Analyses and Design, Drainage Studies, and Urban & Rural System Design.  My responsibilities also include determining the current status of existing drainage systems resulting from meetings with District 6 staff in addition to field visits. As an extension of the FDOT District 6 Drainage Department, I have also reviewed and commented on numerous drainage reports on behalf of the FDOT. I have reviewed drainage reports corresponding from simple systems adjacent to FDOT roadways to major construction projects for new roadways in the District 6 region. I inputted all pay items in transport and made the electronic submittal.

 

Alton Road Pump Station and drainage design, Miami, FL, FDOT District 6.

From SW 5th Street to Michigan Avenue, 2010

This area of Alton Road flooded heavily during rainfall events and the proposed pump station reduced or eliminated flooding conditions throughout the project area.  The pump station was composed of submerged pumps with an overflow into the Intracoastal Waterway. I modeled the existing and proposed systems using ICPR v3.02 stormwater modeling software in order to identify problem areas and develop an effective solution with three (3) separate drainage pump stations with two 10,000 gpm pumps for each stations. I was involved in the design of the pump stations along with additional responsibilities for producing components of construction plans using geopak drainage, Computation Book, and the Drainage Report.  Additionally to the design of the pump stations, I performed cost estimates and coordination with manufacturers for design specifics.

 

SW 107th Avenue Drainage Design. FDOT District 6., 2010

I was involved with the drainage design for the widening of SW 107th Avenue from Flagler to Tamiami trail/SW 8th Street. I have modeled the existing and proposed systems using ICPR v3.02 stormwater modeling software in order to identify possible problem areas and develop an effective solution.  I developed a drainage report and a bridge hydraulic report under this project.

 

FDOT District 1 & 7: 26 miles long I-75 PD&E Study from Moccasin Wallow Road to south of US 301, Manatee and Hillsborough Counties, Florida, 2008 

As a project Engineer, my responsibilities included data collections for the whole project from different jurisdictions, and search and review of all permits around the project.  The estimate required additional water quality treatment volume due to widening of the roadway from six-lane to eight-lane.  The treatment volume capacity of the existing road side swales were checked, additional required swale volume for the treatment was estimated along with existing cross culvert capacity and culvert extension length due to widening and additional culvert head losses.  I performed a pre-post analysis by ICPR for the different segments of the project, estimated flood encroachment storage, and suggested different design alternatives with R/W requisition for offsite ponds. I performed pond siting analysis and pond sizing for the entire segment. 34 pond sites were detected and sized to mitigate the water quality and quantity requirements. Ponds were designed per the requirement of Outstanding Florida Waters (OFW). Pond siting and Pond sizing reports were submitted to SWFWMD and FDOT District-7.

 

Turnpike Widening from Sunrise Blvd to Atlantic Blvd, Broward County, FL, 2007

As a project engineer, I was responsible for upgrading an existing two-way 6-lane roadway to a two-way 8-lane roadway with median barrier walls including ramps & bridges at interchange and cross roads. I was responsible for hydrology & hydraulics design that included surface water modeling, watershed modeling & detention pond design by ICPR, storm drainage design by ASAD, Trench drain design for approx. 12,000 feet flat grade pavement, prepared drainage maps, storm sewer plans & profiles, spread sheets, summary of drainage structures, and prepared permit reports & drainage reports. I went through the permitting process under  SFWMD.

Interchange drainage design: Performed complete drainage design for the interchange at Commercial Blvd including ramps, and toll plaza. I performed design for roadway vertical and horizontal alignment, profiles, cross sections, prepared computation book and project cost estimation.

 

City of Boynton Beach Master Drainage Plan, Palm Beach County, FL, 2005

Entire City of Boynton Beach.    

I performed hydrology & hydraulics Model simulation , water shed and flood plain analysis using HEC-HMS for the entire City of Boynton Beach. Pipe sizing for the master drainage system using ASAD, Canal routing using HEC-RAS and Geo-RAS using City supplied data table, Flood routing for different storm events using AdICPR to find the critical stages.

 

County Road-48, 1 mile long, Sumter County, FL:  2006    

I was a project engineer for the reconstruction of a local street within a residential neighborhood from a 2-lane flush section to a curb and gutter section. I developed cross sections and designed the drainage systems. Resolved drainage conflicts within a very intensive utility corridor, which included large water and sewer mains for two municipalities.

 

Master Drainage system design Community Redevelopment Agency (CRA)City of Riviera Beach, Palm Beach County, FL, 2006                                   

Performed the master drainage system design using EPA-SWMM and performed quality control. Communicated with different agencies and attended meetings with different authorities.

 

SR301, Hillsborough County, FL, 2007    

Project consisted of 1 mile long roadway improvement from Fulkenberg to Causeway Boulevard in Hillsborough County. As a project engineer, my responsibilities included permit search to find the existing flows directed to our project. Analyzed the existing hydrology using EPA-SWMM model. Designed two inter connected dry pond with control structures outfalling to Delaney Creek. Modeled the proposed improvement using EPA-SWMM. Performed drainage system design using GeoPak drainage. Went through the ERP permitting process under SWFWMD.

 

Warner Creek Water Quality Retrofit Project @ Martin County, Florida

5,029 Acres Warner Creek Basin Water Quality Improvements: 2006

Existing basin study, review of existing SFWMD permits and stormwater management systems within the watershed area, drainage calculations/report, developing ICPR Model for existing and proposed conditions, Warner Creek flood profile determination for existing/proposed conditions, SFWMD ERP Permitting, Calibration of ICPR model with respect to the surveyed storm stages along the Warner Creek during the recent Tropical Storm, Existing twin 60” storm pipes under Pinelake Village Blvd were determined to be insufficient for conveyance and are proposed to be replaced by twin 10’x7’ box culverts to improve flood protection for upstream area.

Proposed improvements include construction of a Stormwater Treatment Area (STA) to provide additional water quality treatment volume for the Creek basin, widening/regrading of existing creek between 24th Street and Pinelake Village Blvd, and between the FEC rail road bridge and SR 707 (Dixie Highway) Bridge

 

Indiantown DRI @ Martin County, Florida, 804± Acres DRI Land Development Project: 2006

Master Surface Water Management System Design, ICPR Modeling for Pre vs. Post conditions, Stormwater Management Report, Stormwater Calculations, SFWMD ERP Conceptual Permitting, Pre-Development Basin Map, Post-Development Basin Map. Master Surface Water Management System consists of existing nine wetlands, proposed wet detention areas, modification of an existing primary ditch that provides conveyance to future Quillen DRI project and other offsite areas as well as the onsite proposed basins.

 

Tropical Farms Water Quality Retrofit Project @ Martin County, Florida

1,915 Acres Roebuck Creek Basin Water Quality Improvements: 2005

Surface Water Management System Design, ICPR Modeling, Drainage Report, Drainage Calculations SFWMD ERP Permitting, Pre-Development Basin Map, Post-Development Basin Map. Surface Water Management System includes a lake and Stormwater Treatment Area (STA) to provide water quality for first inch of runoff from the water quality deficient area of the Roebuck Creek Watershed Conversion of Ditch/Swale conveyance system along Locks Road to a Storm Pipe Network. System, Roebuck Creek Water Flood Profile analysis for Pre vs. Post project conditions for different storm events.   

 

Public Infrastructure and Site Development

 

Miami Art Museum and Miami Science Museum, Miami, FL.  Commercial development. 2010       

I am the Engineer of Record (EOR) for the surface water system design and the civil design of the museum projects. The surface water system consisted of exfiltration trenches, onsite dry pond and five injection wells. I processed SFWMD, PERA and FDEP permits for surface water and injection wells. I designed the project  as a self contained system with eight drainage wells. I performed utility design, coordination.

 

Flamingo Plat : Broward County , FL, 97 acres residential development. 2003

Responsible for the design of the water distribution, sewage collection, paving and drainage     systems for the 97 acre residential development.

The surface water management calculations included a flood plain encroachment analysis that was approved by Central Broward Water Control District (SFWMD).

Cutler Run @ Broward County, Florida, 252 Acres Residential Development:2003

Surface Water Management System Design, Conceptual Drainage Calculations, ICPR Modeling, Drainage Report, SFWMD ERP Conceptual Permitting, SFWMD ERP Standard General permitting for Phase 1 and Phase 2A. Water Distribution and Wastewater Collection System Design, Florida Department of    Environmental Protection permitting for Water Main Extension and Wastewater Collection System. FDOT Drainage Connection Permitting, FDOT Driveway Connection Permitting Site Grading, Earth Work and Fill Balance Calculations, Utility Conflicts Analysis SFWMD ERP Permit Modification for adjacent Highway for offsite road work Opinion.

 

Boynton Village, Palm Beach County, FL. 112 acre Commercial development. 2005-2007     

Attend to the Project meeting. Assist the task manager engineer (Civil) in the environmental permit search, design calculations and design preparations. Assisted Civil Team in the design and engineering calculation of a large sewer pump station sites,  hydrology calculation, pavement design etc. Construction services.

 

Grove Commons, Zephyrhills, Pasco County, FL-  347 acres residential development. 2007

Responsible for the design of the water distribution, sewage collection, paving and drainage   systems for the 347 acre residential development. The surface water management calculations included a flood plain encroachment analysis for a closed basin that was approved by SWFWMD.

 

Rinker Material-Bushnell, Sumter County, FL, Industrial Development: 2006

Responsible for the design of the paving and drainage systems for the 14 acre industrial development per Florida Department of Environmental Protection (FDEP) criteria. The surface water management calculations included a Type-I pond, non-contact pond, settlement basin, Type-II structures, pool volume and pool depths.

 

Toyota of Hollywood, FL, 6.5 Acres Commercial Land Development Project, 2004

I provided utility design, permitting and surface water management design and environmental resources permitting.

 

Palm Beach Acura, Palm Beach, Florida-8.4 ac Commercial Land Development Project        

I provided utility design, permitting and surface water management design and environmental resources permitting.2004

 

Miami Lakes Target, Miami-Dade County, Florida, Commercial Land Development Project, 2000-2007 - I provided utility design, permitting and surface water management design and environmental resources permitting, sewer lift station design, added exclusive right turn lane on Miami Gardens Drive to Red Road, wetland mitigation.

 

CVS Clint Moore, Boca Raton, FL- Commercial Land Development Project-2006: I provided utility design, permitting and surface water management design and environmental resources permitting.

 

Construction Management and Construction Engineering Inspection (CEI)

 

Sanitary Sewer Connection at Sabal Palm Elementary School. MDCPS.

I assisted with the development of construction contract documents; the preparation of permit applications. I was responsible for the construction phase of this project, which included field inspections for quality control, monthly meetings and shop drawing reviews. I was also  responsible for reviewing and approving the Contractor’s monthly payment requisition.

 

Greynolds Park Elementary School. MDCPS.

I assisted with the development of construction contract documents, the preparation of permit applications and construction phase services for general repairs and rehabilitation of the mentioned school. 

Sanitary Sewer Connection at West Little River Elementary School. MDCPS.

I was responsible for the construction phase of this project. I performed site visits for the installation of the sewer system including gravity pipe line, force main structures and pump station. I also coordinated issues with the contractor, shop drawing reviews and quality assurance inspections. I was responsible for reviewing and approving the Contractor’s monthly payment requisition.

 

Water Main Improvements N.W. 56th Avenue – From N.W. 11th Street to N.W. 19th Street. City of Lauderhill, Florida.

I assisted with the development of construction contract documents, the preparation of permit applications and construction phase services to improve the water main system for N.W. 56th Avenue from N.W. 11th Street to N.W. 15th Street. 

 

Comprehensive Water Resources Plan. East County Water Control District (ECWCD).

I assisted with the data review for the watershed planning for the East County Water Control District (ECWCD) to develop the comprehensive water resources plan. The Comprehensive Plan resultED in a re-design of a number of existing structures on canals in the areas covered by the ECWCD jurisdiction.

 

Hialeah Senior High School Baseball Netting (Specialty Project Consultant Contract). Miami Dade County Public Schools (MDCPS).

I was responsible for the construction phase of this project. I performed site visits for the erection of the poles and netting for the softball field.  I also coordinated issues with the contractor and prepared client submittals.

 

Scott Lake Elementary School Basketball Courts. Miami-Dade County Public Schools (MDCPS)

I was responsible for the construction phase of this project. I performed site visits for the inspection of the structural components for the basketball standards.  I coordinated issues with the contractor, structural shop drawings review including wind load calculations and prepared client submittals.

 

Guardhouses and Structural Modifications to Solid Waste Facilities.  Miami-Dade County Department of Solid Waste Management (DSWM).

I was involved in the structural modifications to the West Transfer Station.  The structural modifications included the redesigning of the footers to accommodate the change in the building’s design.  My work also included shop drawing reviews and coordination with the building department.

 

Project Scheduling

 

Miami International Airport, North Terminal Program – Construction Scheduling Contract – Scheduling Support Services. 2010

I was assigned as project scheduler to the program and was responsible for construction scheduling for projects 740A, 779D and 779G. My duties included preparing the baseline schedule; analyzing, updating the construction schedule; requesting weekly reports of the status of construction generated by the trades; and assessing time adherence to contract documents. I also performed risk management and prepared impact schedules as required as the project progresses.

 

Construction Scheduling Consultant Contract – Scheduling Support Services for State School “SS1”; Miami Dade County Public Schools (MDCPS): 2010

I assisted with this project’s baseline schedule by analyzing, updating and commenting on the construction schedule; requesting weekly reports of the status of construction generated; and assessing time adherence to contract documents.

 

I analyzed all technical aspects of construction schedules and prepared schedules planning, design and construction; monitored schedules and took appropriate actions to ensure that project is completed on schedule and within approved cost limitations; provided ongoing interface with contractors, construction managers, construction site personnel and senior management on project issues; participated in the development and issuance of project procedures and policies; resolved issues and problems raised in field reports made by design and construction management staff; worked with the architect/engineer of record regarding change orders, time extension, performed interpretation of contract documents, shop drawing submittals/approvals and other technical matters as required to ensure a structurally sound, code compliant and aesthetic facility. I issued field memoranda and directives to contractors to enforce contract compliance. I used sound, independent judgment to make on-site change order decisions.  I negotiated with contractors and committed resources on such change orders; review contractors' claims or disputed work and advise senior management officials.

 

South Miami Heights High Pump Station, Miami, FL. 2010-2011

I was assigned to Miami-Dade Water and Sewer Department’s (M-DWASD) South Miami Heights Water Treatment Plant. My primary responsibility consisted of the following:

Reviewing and accepting Critical Path Method (CPM) project schedules submitted by the Contractor, which include the baseline schedule and the subsequent schedule updates. Preparing technical reports which make full assessment of the schedule submittals and integrate CPM analysis and Earned Value techniques to assure contractual parameters are met and measure cost progress. Reviewing Schedule of Values (SOV) prepared by Contractor. Making recommendations to project management. I analyzed all technical aspects of construction schedules and prepared schedules planning, design and construction; monitored schedules and took appropriate actions to ensure that project is completed on schedule and within approved cost limitations; provided ongoing interface with contractors, construction managers, construction site personnel and senior management on project issues; participated in the development and issuance of project procedures and policies; resolved issues and problems raised in field reports made by design and construction management staff; worked with the architect/engineer of record regarding change orders, time extension, performed interpretation of contract documents, shop drawing submittals/approvals and other technical matters as required to ensure a structurally sound, code compliant and aesthetic facility. I issued field memoranda and directives to contractors to enforce contract compliance. I used sound, independent judgment to make on-site change order decisions.  I negotiated with contractors and committed resources on such change orders; review contractors' claims or disputed work and advise senior management officials.

 

WORKING STATUS: U.S. Citizen. 

Relocation / Travel: Ready to Relocate and Travel as required. 

REFERENCES: Available upon request.



Experience

BACK TO TOP

 

Job Title

Company

Experience

Transportation Engineer

ADA Engineering, Inc

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

7+ to 10 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Other Active Clearance

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Transportation Engineer

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Engineering Services

Occupation:

Engineering

·         Civil & Structural Engineering

·         General/Other: Engineering

 

Target Locations:

Selected Locations:

US-FL-Ft. Lauderdale

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Fluent

Spanish

Fluent